Annual Action Plan of District Ambala for the Year 2015-16
          (Rs. in Lacs)  
Sr. No. Name of Executive Agency/ Deptt. Block Name of the schemes/ works  Total Cost       SC component Remarks
1 ASCO, Naraingarh Ambala-I 10 Nos. Interception Bundh cum Diversion Embankment along with River Bank both side (75 Ha. Area) in village Farouli    9.50 -- Community work 
2 do Ambala-I  6 Nos. Interception Bundh cum Diversion Embankment along with River Bank both side (50 Ha. Area) in village Shahpur   5.50 5.50 Community work 
3 do Ambala-II 1/6 Nos. WHS-I/ Interception Bundh cum Diversion Embankment along river bank both side (80 Ha. Area) in village Khudda   18.00 18.00 Community work 
4 do Ambala-II 1/2 Nos.  Drop Str. With E/work /Earthen Embankment on Rasta /Div. Emb. (120 Ha. Area) in village Salarheri  10.00 -- Community work 
5 do Ambala-II 1/8 Nos. WHS-I /Earthen Bundh /Diversion Embankment on the River Bank (60 Ha. Area) in village Manglai    18.00 18.00 Community work 
6 do Saha 7 Nos. Interception Bundh cum Diversion Embankment along with River Bank both side (60 Ha. Area) in village Kharu Khera    6.00 6.00 Community work 
7 do Saha 1 Nos. WHS-I/Causeway pipe type culvert(12 Ha. Area)   in village Sambhalkha    15.00 15.00 Community work 
8 do Saha 1/4 Nos. Aprian of Causeway / Earthen Bundh /Diversion Embankment on the River Bank (45 Ha. Area) in village  Pilkhani  5.00 -- Community work 
9 do Shahzadpur 1/7 Nos. WHS-I/ Earthen embankment Diversion Embankment along with River Bank both side (95 Ha. Area) in village Bharog   15.00 -- Community work 
10 do Shahzadpur 10 Nos. Interception Bundh cum Diversion Embankment along with River Bank both side (75 Ha. Area)  in village Korwa  9.50 9.50 Community work 
11 do Shahzadpur 10 Nos. Interception Bundh cum Diversion Embankment on path with Brick Blast for Water recharging (80 Ha. Area) in village Shahzadpur   9.00 -- Community work 
12 do Shahzadpur 2/7 Nos. WHS-2 No. /Earthen Bundh cum Diversion Embankment on the River Bank (75 Ha. Area) in village Babak Majra
(Be Chirag )
30.00 -- Community work 
13 do Naraingarh 1 No. Interception Bundh cum Diversion Embankment on path with Brick Blast for Water recharging (10 Ha. Area) in village Bhurewala  3.50 -- Community work 
14 do Naraingarh 4 Nos. Interception Bundh cum Diversion Embankment on path for water recharging (50 Ha. Area) in village Chandsouli   3.75 -- Community work 
15 do Naraingarh 4 Nos. Interception Bundh cum Diversion Embankment  for water recharging( 35 Ha. Area ) in village Bhareri Khurd   3.50 -- Community work 
16 do Naraingarh 1/3 Nos. Drop Str. With Earthen Suport
 Labour work (30 Ha. Area) in village Sambhalwa 
3.00 3.00 Community work 
      TOTAL 164.25 75.00  
             
17 DFO, Ambala  Shahzadpur Construction of Water Harvesting Structure, Silt detention dam in Jangu Majra( Length 90 mtrs., Height 7 Mtrs.) [(GPS Cordinates-  Longitude 30°30'18.7"N &  Latitude 77°03'19.7"E)] 10.00 10.00 --
18 do Shahzadpur Construction of Water Harvesting Structure, Silt detention dam in Jangu Majra( Length 60  mtrs., Height 3 Mtrs.) [(GPS Cordinates-  Longitude 30°30'16.5"N &  Latitude 77°03'20.4"E)] 2.00 2.00 --
19 do Shahzadpur Construction of Water Harvesting Structure, Silt detention dam in Jangu Majra ( Length 100 mtrs., Height 3 Mtrs.) [(GPS Cordinates-  Longitude 30°28'51.8"N &  Latitude 77°03'38.4"E)] 4.00 4.00 --
      Total 16.00 16.00  
      G.Total  180.25 91.00